Saturday 10 August 2013


not a lot of work has been done in the bay the B&B has been striped ready to start building and a bit of work trying the layout for the other building being renovated it will be general store and fish shop on ground floor with cafĂ©/ restraint over fish shop and hairdressers over the store and the top floor will be a small one bedroom flat.





No comments:

Post a Comment

a